Units 310 and 402 Construction Update – 09.27.10 Posted on September 27, 2010 by Austin Black II Construction continues on units 310 and 402 at the Willys Overland Lofts. Although both units have only been under construction for 10 days, most of the studs are up. Loft 402 (model) – 09.27.10 Loft 310 – 09.27.10